EPASS is the Emergency Personnel Access Safety System. EPASS has been specifically engineered and designed to provide the end user with a rapid response, multi functional ventilation stopping.
Using the Ventstop Cube profile that is designed to facilitate most drive/drift/tunnel/ horizontal and vertical voids, we have now added an access through the stopping, with a variety of entry and exit covers to maintain blocking integrity.
To compliment this and expand on the functional use, a transition section can be added to facilitate various foaming machines and other types of fire fighting aids.
The EPASS comes with it's own transportation/storage unit (with forklift facilities) that doubles as a solid and secure base under the access tunnel. The EPASS has the capability of being in full operational mode in under 20 minutes once it has been delivered to the desired location.
The EPASS comes as a complete kit consisting of.
The EPASS can be designed to clients requirements, and is also available in FRAS fabrics with or without heat shielding options.
02.02.2018
Minvent Solutions has relocated their offices to the following address: 175A Star Street, Carlise, Western Australia 6101. NEW phone number: 08 61102089
11.05.2017
Ventilation Videos have been upload to You Tube. Check out links under Minvent Products - Ventilation Controls
09.02.2016
Just a short message to thank you Minvent Solutions for the excellent service that you have provided to Boral Cement. Both myself and the management team at Boral Cement - Berrima are most impressed with this project from concept to commissioning. Personally, I would like to express my gratitude to all involved. Planned Maintenance Supt / Refractory Installation Supt Boral Cement - Berrima
05.11.2015
Minvent Solutions are proud sponsors of Queensland Mines Rescue Services (QMRS) 2015 Nationals Comp
27.10.2015
"We’ve used the EPASS in several locations and the guys like them a lot. They appreciate the simplicity of them and how quickly we can install them. I’ve been bragging about us having the inflatable walls and telling people that they work well." Pogo Mine Alaska 10/8/2014
15.10.2013
Entry was granted and inspection completed of 4 cyclone vessels within 2 hours, when Redbank Power Station installed an OPS. Compared with 2 days to scaffold, the OPS saved valuable time with zero exposure to personnel as entry is not required to install systems.
02.09.2013
QAL Gladstone utilized the Minvent Solutions OPS to create a safe working environment in their RP02 Calcination cyclone. Installed and commissioned in under an hour proved extremely cost effective to gain rapid access into the vessel. The Minvent Solutions OPS has proven the ability to reduce access/re-entry times to the work area in a safe and controlled manner with zero exposure to personnel.
01.08.2012
Minvents' FRAS flexible ducting is replacing existing heavy ducting (elephant trunks). At 6.5kg per metre the reduction in weight makes Minvents FRAS flexible ducting easier to handle and reduces the risk of strain/sprain injuries.
30.07.2012
At Broken Hill Rasp Mine a 5 metre raise-bore hole suffered a face failure during back reaming. A Minvent Solutions inflatable plug was lifted up into the raise-bore hole via the pilot hole, inflated and a concrete plug in excess of 250 m/3 was poured in stages onto the plug. (initial pour of 40 ton). This re-established a sound flat working face to resume back reaming.
28.11.2011
The installation of an OPS in one of Northparks surge bins ensured the safe and quick replacement of the wear plates and a happy customer.
19.11.2011
Minvent Solutions' range of FRAS PVC has been tested and certified for use in coal mines by the NSW government's Mine Safety Technology Centre. For more information contact: sales@ minvent.com.au
25.10.2011
Successful installation of a twin OPS system which created a safe work enviroment for workers to change the wear plates in a surge bin.
08.02.2011
A number of new clients are enjoying the benefits of using our high grade, air/water tight blast hole liners.
08.12.2010
Minvent Solutions is proud to announce the successful deployment of the world’s largest single bladder overhead protection system (OPS) at the Nyrstar plant in Hobart Tasmania. The OPS is 16.2 meters in diameter and weighs 1.2 tonne
01.10.2010
Minvent has added Plenum/Aeroduct to their product list. This Plenum / Aroduct is made to customer requirements out of heavy duty PVC. All conponents are fully welded including the spigots to mitigate air loss. This product is used in heap leach operations.
09.08.2010
Minvent Solutions has been awarded the service contract to provide, install and monitor an Overhead Protection System for the furnace at Nystar's Clarksville Tennessee site in September 2010.
03.08.2010
Minvent Solutions have moved to new premises in Bassendean Western Australia. Update your data bases with new contact numbers and physical address. 115 Broadway Bassendean WA 6054 Phone +61 8 93771129 Fax +61 8 93771164
26.05.2010
This month Minvent Solutions have increased their international customer base with Ventstops for metal/nonmetal applications going to Nevada USA, Huelva Spain and Overhead Protection Systems(ore bin) to Chile
17.05.2010
12.03.2010
Our New Website has Launched!
12.05.2005
"The Balloons are performing well, we actually used a balloon 60m behind a breakthrough round in our main decline to stabilise the air flow and make it as if the breakthrough round didn't occur. The balloon performed flawlessly and held with concussion from the blast and 50 cubes of potential airflow. We didn't even tie the balloon in place." Zinifex - Rosebury Mine TAS